Effective lightning protection depends on the air-termination system, down conductors, earthing and associated measures. A conductor on the roof is only one part. We review the documentation, inspect the system and take the relevant measurements.
Service details
Which equipment we cover and what we check
We inspect existing and new lightning protection systems. When booking, tell us the protection class, system type, roof access and any changes to the building. New solar panels, air conditioning or a roof extension can affect the original protection.
What we check
Air-termination system and down conductors
Accessible conductors, joints and fixings, signs of corrosion or damage, and labels at test points.
Earthing and continuity
Measurements using a method suited to the system layout and the available safe access.
How protection relates to the building
Comparison with drawings, taking account of building alterations and accessible associated protection measures.
How to prepare for the technician’s visit
Have the design, lightning protection class, earthing documentation and previous report ready. Tell us about any lightning strikes or building alterations. We’ll agree on safe access to the roof and test joints beforehand. The work also depends on the weather.
What to consider when planning
Measuring the resistance of one earth electrode does not constitute a full inspection. Documentation and installation records are important for concealed or inaccessible parts. For isolated or specialised systems, follow the manufacturer’s instructions.
Inspection results and next steps
We provide the appropriate inspection report or record for the equipment and work carried out. It identifies the equipment and sets out the scope, results and any defects. We explain the findings and discuss what needs to happen next.
If we find a hazard, any further use depends on how serious it is. We agree any repairs and follow-up checks separately from the measurements.
What customers ask
Frequently asked questions
Is an earthing measurement enough?
No. The system also needs a visual inspection and a review of how its parts work together against the documentation. A resistance reading alone does not confirm that the whole system protects the building correctly.
What should I do after a lightning strike?
Arrange a professional inspection without waiting for the routine date. Report any damage to the wiring or electronics.
Do I need an inspection after installing solar panels?
Changes on the roof can affect lightning protection. The assessment depends on the design and the position of the panels and wiring.
Do we need to provide a ladder or platform?
We agree access arrangements based on the property. Send us the height, access options and photos of the roof beforehand.
How often should lightning protection be inspected?
It depends on the protection level and site conditions. See the inspection overview for common intervals and when the shorter interval applies.
How we work
Three steps towards implementation.
01
Contact and consultation
You will tell us what you need and where the work is to be done.
02
Solution and offer
After consultation or inspection, we agree the scope and price.
03
Scheduled
Once agreed, we will agree on a date for implementation.