Home and workplace charging needs a suitable circuit and protection. The wallbox’s power rating must suit the supply and the vehicle. Where several loads share the supply, load management can adjust charging to the available capacity.
Service details
Scope and technical requirements
We design charging for a single parking space or several charging points. We plan the cable route, distribution board, access control and any allocation of energy use. In apartment buildings, ownership and operating arrangements need to be clarified first.
What we consider during design and installation
Power demand and circuit protection
Available capacity, main circuit breaker, supply circuit and required charging power.
Protective measures
Suitable overcurrent protection, residual current protection and earthing for the charging point, as specified by the manufacturer.
Load management and access
Dynamic power limiting, user authorisation, metering and integration options.
What to prepare before work begins
Send the vehicle model, intended location, distance from the distribution board and a photo of the main circuit breaker. Include the number of vehicles, parking duration and any planned expansion. For shared parking, have the property manager’s consent and conditions ready.
What we hand over
Before work starts, we agree on the scope, the documents needed and who will provide site access or assistance. At handover, we review the completed work, the agreed test results and how to use the system. The documentation, test records and any formal inspections depend on the work carried out.
If we find anything that differs from the original brief, we discuss it with you before extending the work. We agree on servicing, follow-up checks and any later expansion based on the system and how it is used.
How we work
What to expect during the work
01
Site survey and supply capacity
We check the available supply and operating requirements.
02
Installation and setup
We prepare the circuit, install the charging point and configure the agreed features.
03
Testing and handover
We check safety, charging and the required documentation, then explain how to use the charger.
What customers ask
Frequently asked questions
Will a 22 kW charging point charge every car at 22 kW?
No. Charging power is also limited by the car’s onboard charger, the available supply and the charging point settings.
Do I need to upgrade the main circuit breaker?
We first assess electrical demand and load management options. If a change is needed, it must meet the connection requirements.
Can individual users be charged for the electricity they use?
Some equipment can track users and their energy use. Billing and metering requirements need to be agreed separately.
Can a wallbox use solar power?
Yes, with compatible controls. It depends on metering, communication and how the entire energy system is configured.
What affects the price and lead time?
The scope of the work, the condition of the property, site access and the chosen equipment all affect the quote. After reviewing the documents or visiting the site, we can confirm the details and give you a realistic schedule. Tell us about any special requirements when you enquire.