Lightning protection relies on several measures working together. The design must intercept strikes, carry the current safely to earth and limit dangerous differences in electrical potential. Roof shape and metal parts are among the factors we assess.
Service details
Scope and technical requirements
We install or upgrade the agreed system in line with the documentation. We account for the protection class, earthing, rooftop equipment and the link to internal protection. New solar PV equipment or an extension should be assessed together with the existing system.
What we consider during design and installation
Lightning protection design
Building information, risk assessment and the relevant design documentation.
Protection system and earthing
Air terminals, down conductors, connections, earth electrodes and integration with the building structure.
Completion and documentation
We check accessible parts, take the relevant measurements and provide an inspection report as agreed.
What to prepare before work begins
Have the building plans, roof plan and equipment details ready. For an upgrade, include the last inspection report. If a foundation earth electrode is planned, coordinate the work before concrete is poured or any parts are covered.
What we hand over
Before work starts, we agree on the scope, the documents needed and who will provide site access or assistance. At handover, we review the completed work, the agreed test results and how to use the system. The documentation, test records and any formal inspections depend on the work carried out.
If we find anything that differs from the original brief, we discuss it with you before extending the work. We agree on servicing, follow-up checks and any later expansion based on the system and how it is used.
How we work
What to expect during the work
01
Site survey and documentation
We check the dimensions, roof and existing protection system.
02
Installation and checks during the work
We install the agreed system and document components that will be concealed.
03
Measurement and handover
We complete the checks and the relevant formal inspection and provide the maintenance documentation.
What customers ask
Frequently asked questions
Does a lightning protection system also protect electronics?
Some surge risks require additional internal protection. Earthing, equipotential bonding and internal protective measures need to work together.
Do I need a design plan?
The system should be based on the relevant documentation and an assessment of the building. We will confirm what documents you need when you enquire.
Can the existing earthing be reused?
We can confirm that after checking the documents, condition and measurement results. A visible terminal alone is insufficient to assess suitability.
How does solar PV affect lightning protection?
Panels and cables change the roof layout. The protected volume, separation distances and related measures need to be checked.
What affects the price and lead time?
The scope of the work, the condition of the property, site access and the chosen equipment all affect the quote. After reviewing the documents or visiting the site, we can confirm the details and give you a realistic schedule. Tell us about any special requirements when you enquire.