Structured cabling provides a permanent infrastructure for data, telephony and network equipment. The design should reflect workstation numbers, bandwidth requirements and future expansion. Performance depends on the entire link and how it is installed, as well as the cable rating.
Service details
Scope and technical requirements
We install the agreed data routes, outlets and cabinets, and terminate copper or appropriately designed fibre links. Active equipment, Wi-Fi coverage and network configuration are agreed separately. A continuity test and a certification test of transmission performance provide different results.
What we consider during design and installation
Cable routes and capacity
Number of outlets, cabinet location, spare capacity and coordination with power wiring.
Materials and termination
A compatible system, the right category, outlets, patch panels and tidy cable management.
Labelling and testing
Port identification and the agreed tests with their results.
What to prepare before work begins
Have a floor plan and a list of workstations, cameras, access points and other equipment ready. Tell us the speeds you need, any PoE requirements and the rack available. Request certification testing and its scope in the brief.
What we hand over
Before work starts, we agree on the scope, the documents needed and who will provide site access or assistance. At handover, we review the completed work, the agreed test results and how to use the system. The documentation, test records and any formal inspections depend on the work carried out.
If we find anything that differs from the original brief, we discuss it with you before extending the work. We agree on servicing, follow-up checks and any later expansion based on the system and how it is used.
How we work
What to expect during the work
01
Infrastructure design
We specify ports, cable routes, cabinets and required performance.
02
Installation and termination
We install the agreed cabling and label the connection points.
03
Testing and documentation
We verify the agreed parameters and deliver a port map and the relevant test records.
What customers ask
Frequently asked questions
Is Category 6 cable enough for a fast network?
Performance depends on length, all components, installation and active equipment. The cable rating alone cannot guarantee the result.
Can I power cameras over the network?
Yes, with compatible Power over Ethernet equipment. Check power supply capacity, cables, connectors and the total load.
Is Wi-Fi included in the quote?
Wireless coverage and active equipment depend on the agreed scope. The cabling provides the underlying infrastructure.
What is cable certification testing?
It checks a link’s defined transmission parameters against a selected limit. A basic wiring tester checks a different set of properties.
What affects the price and lead time?
The scope of the work, the condition of the property, site access and the chosen equipment all affect the quote. After reviewing the documents or visiting the site, we can confirm the details and give you a realistic schedule. Tell us about any special requirements when you enquire.